The numbers
Simulation vs. physical hardware testing, targeted.
These are the target figures we're engineering ARTE to hit — illustrative goals, not yet independently audited production results.
98.4%success
Goal Success Rate
0accidents
Collision Count
0.05mdeviation
Average Path Deviation
2.2 minper commit
Validation Turnaround
| Physical testing | ARTE simulation | |
|---|---|---|
| Validation turnaround | 3–14 days per release | 2.2 minutes per commit |
| Cost per test suite | $450–$1,200 | < $0.08 |
| Scenario coverage | 1–5 manual trials | 500+ automated |
| Hardware damage risk | Severe | None — simulated |
| Reproducibility | Low | 100% deterministic |